Global transmission capacity was estimated to have reached 19,883,744MVA by the end of 2021 and is forecasted to grow to 27,052,399MVA by 2027. Venezuela had 97,456MVA of capacity in 2021 and this is expected to rise to 114,439MVA by 2027. Listed below are the five largest transmission projects by capacity in Venezuela, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Charallave Substation
Charallave Substation is a 765/230kV substation located at Charallave, Miranda, Venezuela. The substation is planned and is expected to be commissioned in 2023. The Charallave Substation will be operated by Corporacion Electrica Nacional SA.
The designed voltage level of the substation is 765/230kV and the operating voltage level is 765/230kV. The step in voltage of the project is 765kV and the step out voltage is 230kV.
Charallave Substation is owned by Corporacion Electrica Nacional SA. Buy the profile here.
2. La Arenosa Substation
La Arenosa Substation is a 765kV substation located at La Arenosa, Bolivar, Venezuela. The substation is under construction and is expected to be commissioned in 2023. The La Arenosa Substation will be operated by Corporacion Electrica Nacional SA.
The designed voltage level of the substation is 765kV and the operating voltage level is 765kV. The step in voltage of the project is 765kV.
La Arenosa Substation is owned by Corporacion Electrica Nacional SA. Buy the profile here.
3. Yaracuy Substation
Yaracuy Substation is a 765kV substation located at Yaracuy, Yaracuy, Venezuela. The substation is under construction and is expected to be commissioned in 2023. The Yaracuy Substation will be operated by Corporacion Electrica Nacional SA.
The designed voltage level of the substation is 765kV and the operating voltage level is 765kV. The step in voltage of the project is 765kV.
Yaracuy Substation is owned by Corporacion Electrica Nacional SA. Buy the profile here.
4. Cabudare Substation
Cabudare Substation is a 230/115kV substation located at Cabudare, Lara, Venezuela. The substation is planned and is expected to be commissioned in 2023. The Cabudare Substation will be operated by Corporacion Electrica Nacional SA.
The designed voltage level of the substation is 230/115kV and the operating voltage level is 230/115kV. The step in voltage of the project is 230kV and the step out voltage is 115kV.
Cabudare Substation is owned by Corporacion Electrica Nacional SA. Buy the profile here.
5. Guri A Substation
Guri A Substation is a 230/34.5/13.8kV substation located at Guri, Bolivar, Venezuela. The substation is under construction and is expected to be commissioned in 2023. The Guri A Substation will be operated by Corporacion Electrica Nacional SA.
The designed voltage level of the substation is 230/34.5/13.8kV and the operating voltage level is 230/34.5/13.8kV. The step in voltage of the project is 230kV and the step out voltage is 13kV.
Guri A Substation is owned by Corporacion Electrica Nacional SA. Buy the profile here.
For more details on the latest transmission substation projects, buy the project profiles here.