Global transmission capacity was estimated to have reached 19,883,744MVA by the end of 2021 and is forecasted to grow to 27,052,399MVA by 2027. Bulgaria had 33,809MVA of capacity in 2021 and this is expected to rise to 34,621MVA by 2027. Listed below are the five largest transmission projects by capacity in Bulgaria, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Blagoevgrad Substation
Blagoevgrad Substation is a 400kV substation located at Blagoevgrad, Blagoevgrad, Bulgaria. The substation is proposed and is expected to be commissioned in 2027. The Blagoevgrad Substation will be operated by Electroenergien Sistemen Operator EAD.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.
Blagoevgrad Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.
2. Burgas Substation
Burgas Substation is a 400/110kV substation located at Burgas, Burgas, Bulgaria. The substation is proposed and is expected to be commissioned in 2025. The Burgas Substation will be operated by Electroenergien Sistemen Operator EAD.
The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV. Upon completion, the substation will be able to operate at 250MVA.
Burgas Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.
3. Dobrudzha Substation
Dobrudzha Substation is a 400/110kV substation located at Dobrudzha, Dobrich, Bulgaria. The substation is planned and is expected to be commissioned in 2028. The Dobrudzha Substation will be operated by Electroenergien Sistemen Operator EAD.
The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV. Upon completion, the substation will be able to operate at 250MVA.
Dobrudzha Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.
4. Maritza East Substation
Maritza East Substation is a 400kV substation located at Maritza East, Stara Zagora, Bulgaria. The substation is under construction and is expected to be commissioned in 2023. The Maritza East Substation will be operated by Electroenergien Sistemen Operator EAD.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV. Upon completion, the substation will be able to operate at 100MVA.
Maritza East Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.
5. Zlatograd Substation – Upgrade – 400/110/20 kV
Zlatograd Substation – Upgrade – 400/110/20 kV is a 400/110/20kV substation located at Zlatograd, Sofia, Bulgaria. The substation is planned and is expected to be commissioned in 2024. The Zlatograd Substation – Upgrade – 400/110/20 kV will be operated by Electroenergien Sistemen Operator EAD.
The designed voltage level of the substation is 400/110/20kV and the operating voltage level is 400/110/20kV. The step in voltage of the project is 400kV and the step out voltage is 20kV.
Zlatograd Substation – Upgrade – 400/110/20 kV is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.
For more details on the latest transmission substation projects, buy the project profiles here.