Global transmission line length was estimated to have reached 5,465,957Ckm by the end of 2021 and is forecasted to grow to 6,485,343Ckm by 2027. Romania had 8,904Ckm of line length in 2021 and this is expected to rise to 9,028Ckm by 2027. Listed below are the five largest transmission projects by line length in Romania, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

1. Brazi Vest – Teleajen – Stalpu Line

The Brazi Vest – Teleajen – Stalpu Line is a 400kV overheadBrazi Vest to Stalpu. The project is planned and is expected to be commissioned in 2024.

The Brazi Vest – Teleajen – Stalpu Line is an overhead line that will be operated by Transelectrica. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

2. Bucuresti Sud – Pelicanu Line

The Bucuresti Sud – Pelicanu Line is a 400kV overheadBucuresti to Pelicanu. The project is planned and is expected to be commissioned in 2023.

The Bucuresti Sud – Pelicanu Line is an overhead line that will be operated by Transelectrica. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

3. Calea Aradului – Arad Line

The Calea Aradului – Arad Line is a 400kV overhead line with a length of 46.9Ckm running from Calea Aradului to Arad. The project is planned and is expected to be commissioned in 2023.

The Calea Aradului – Arad Line is an overhead line that will be operated by Transelectrica. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

4. Cernavoda – Stalpu Line

The Cernavoda – Stalpu Line is a 400kV overheadCernavoda to Stalpu. The project is planned and is expected to be commissioned in 2023.

The Cernavoda – Stalpu Line is an overhead line that will be operated by Transelectrica. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

5. Timisoara – Sacalaz – Arad Line

The Timisoara – Sacalaz – Arad Line is a 400kV overheadTimisoara to Arad. The project is planned and is expected to be commissioned in 2025.

The Timisoara – Sacalaz – Arad Line is an overhead line that will be operated by Transelectrica. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.