Global transmission line length was estimated to have reached 5,465,957Ckm by the end of 2021 and is forecasted to grow to 6,485,343Ckm by 2027. Peru had 29,983Ckm of line length in 2021 and this is expected to rise to 36,906Ckm by 2027. Listed below are the five largest transmission projects by line length in Peru, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

1. Carabayllo – Chimbote – Trujillo Line

The Carabayllo – Chimbote – Trujillo Line is a 500kV overheadCarabayllo to Trujillo. The project is under construction and is expected to be commissioned in 2024.

The Carabayllo – Chimbote – Trujillo Line is an overhead line that will be operated by Sociedad Electrica Del Sur Oeste. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

2. Celendin – Trujillo Line

The Celendin – Trujillo Line is a 500kV overhead line with a length of 187Ckm running from Celendin to Trujillo. The project is planned and is expected to be commissioned in 2026.

The Celendin – Trujillo Line is an overhead line that will be operated by Ministry of Energy and Mines, Peru. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

3. Chilca – La Planicie – Carabayllo Line

The Chilca – La Planicie – Carabayllo Line is a 500kV overhead line with a length of 89Ckm running from Chilca to Carabayllo. The project is planned and is expected to be commissioned in 2023.

The Chilca – La Planicie – Carabayllo Line is an overhead line that will be operated by Consorcio TransMantaro. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

4. Nueva Yanango – Carapongo Line

The Nueva Yanango – Carapongo Line is a 500kV overhead line with a length of 200Ckm running from Nueva Yanango to Carapongo. The project is under construction and is expected to be commissioned in 2023.

The Nueva Yanango – Carapongo Line is an overhead line that will be operated by Consorcio TransMantaro. The line will carry alternating current (AC) through single circuit cable. Buy the profile here.

5. Nueva Yanango – Nueva Huanuco Line

The Nueva Yanango – Nueva Huanuco Line is a 500kV overhead line with a length of 184Ckm running from Yanango to Huanuco. The project is under construction and is expected to be commissioned in 2023.

The Nueva Yanango – Nueva Huanuco Line is an overhead line that will be operated by Consorcio TransMantaro. The line will carry alternating current (AC) through single circuit cable. Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.