Tidong I is a 150MW hydro power project. It is planned on Tidong Khad river/basin in Himachal Pradesh, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the under construction stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in 2024. Buy the profile here.
Description
The project is being developed by NSL Tidong Power Generation and is currently owned by Statkraft with a stake of 100%.
Tidong I is a run-of-river project. The hydro reservoir capacity is planned to be 0.237 million cubic meter. The gross head and net head of the project will be 615.31m and 600.32m respectively. The penstock diameter will be 2.5m. The project is expected to generate 414 GWh of electricity.
Tidong I (Tidong I-Phase-II) consists of 1 turbine with 50MW nameplate capacity.
Development status
Post completion of the construction, the project is expected to get commissioned in 2024.
Contractors involved
Tidong I (Tidong I-Phase-I) will be equipped with GE Power India pelton turbines. The phase consists of 2 turbines with 50MW nameplate capacity.
GE Power India is expected to supply 2 electric generators for the Tidong I (Tidong I-Phase-I). The generator capacity is likely to be 55.55 MVA.
For more details on Tidong I, buy the profile here.