Astana is a 100.05MW onshore wind power project. It is planned in Akmola, Kazakhstan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the partially active stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in 2019. Buy the profile here.
Description
The project is being developed by CAPEC Green Energy and TSATEK Green Energy. The project is currently owned by CAPEC Green Energy with a stake of 100%.
The project is expected to generate 306,000MWh electricity and supply enough clean energy to power 10,000 households. The project is expected to offset 230,000t of carbon dioxide emissions (CO2) a year.
The turbines that are getting installed on the Astana (Astana_II), will be using Tubular Steel towers.
Development status
Post completion of the construction, the project is expected to get commissioned in 2019.
Contractors involved
Vestas Wind Systems is expected to render engineering procurement construction services for the wind power project.
Astana (Astana_I) will be equipped with Vestas Wind Systems V112-3.45 MW turbines. The phase consists of 15 turbines.
Astana (Astana_II) will be equipped with Vestas Wind Systems V117-3.45 MW turbines. The phase consists of 14 turbines with 3.45MW nameplate capacity.
Vestas Wind Systems is expected to perform operations and maintenance for the Astana (Astana_I). The O&M tenure will likely be commencing from the year 2019.
Vestas Wind Systems is expected to perform operations and maintenance for the Astana (Astana_II) for a period of 10 years.
For more details on Astana, buy the profile here.